Opheusden, 11 Janualy 2016 The wood work of the gallery rail is assembled. It is integrated with the positiv case and accentuates the horizontal lines. |
Opheusden, 6 January2016 The pulpit is assembled. In the back wall a steel frame stabilizes the pulput. |
Opheusden, 23 December 2015 The positiv case including a steel frame is hoisted into place. It is move nackwards to allow the steel frame to be fix into the maina case. |
Opheusden, 18 December 2015 The assembly works reaches its highest point with the top part of the main tower. |